C. Water, gas, sanitary sewer mains, and storm             escrow account with a responsible financial
     drains shall be constructed prior to the              institution, or the deposit to the City of Portland
     installation of paving with all mains being           finance department and shall be in conformance
     extended from all lots having sufficient stub         with the templates and forms made available by the
     outs to avoid subsequent breaking of                  City. If the defect guarantee is a deposit to the City,
     pavement.                                             the City shall hold such funds in a noninterest-
D. Sidewalks and curbs shall be constructed as             bearing account until criteria for performance
     required in Section 14.5.                             guarantee release have been satisfied. The
E.   Adequate storm drains shall be constructed            performance guarantee shall be in the name of the
     subject to the provisions of Section 14.5 and in      City and shall be approved by the Finance Director
     accordance with the Public Works Authority            as to financial sufficiency and the Corporation
     specifications.                                       Counsel as to proper form and legal sufficiency.
F.   A total of two trees per lot shall be street trees,
     planted near the street line in full public view      14.7.13 Use of the performance guarantee
     on private property, as directed by the City          In the event that a development site is abandoned
     Arborist. Existing healthy trees may be credited      or the site improvements do not meet City
     toward this requirement, subject to the               standards as approved in the subdivision plat, the
     approval of the City Arborist.                        performance guarantee may be utilized to stabilize,
G. Permanent markers shall be set as prescribed            secure, complete construction, and/or restore the
     by the Public Works Authority.                        site as may be necessary, including, but not limited
H. All utility lines shall be placed underground           to, revegetation of areas, grading, and fencing.
     unless otherwise approved by the Planning
     Board.                                                14.8   CONSTRUCTION RECORDS AND
I.   Street lighting shall be installed in accordance             INSPECTION
     with the standards of the Public Works                14.8.1 Inspection of construction
     Authority.                                            The City shall have the right to enter and inspect
J.   A public water supply shall be installed subject      the construction site during all phases of the
     to the approval of the Portland Water District.       project to ensure compliance with this article.
K. Erosion control measures shall be taken both
     during and after construction in accordance           14.8.2 Required construction records
     with the standards of the Public Works                After approval of the subdivision plat and prior to
     Authority.                                            the construction of any of the subdivision's public
                                                           improvements, the subdivider shall supply the City
14.7.12 Acceptable forms for the defect                    Engineer with a complete set of engineering
        guarantee                                          drawings showing all streets, sanitary sewers, and
The defect guarantee, 10% of the original                  surface water drains, and all appurtenant work
performance guarantee amount approved by the               within the subdivision.
Planning Authority, shall be a letter of credit, an CITY OF PORTLAND LAND USE CODE | 14-13 SUBDIVISIONS