INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

5,182 chars
TABLE 11-A: SHORELAND TREE STAND RATING SYSTEM                 limited to that which is necessary for uses
                           Diameter                            expressly authorized in the underlying
       (at 4½ ft. above ground level) Points                   zone.
                             2 in. - <4 in.   1           3.   Other than cutting or removal of
                             4 in. - <8 in.   2                vegetation as provided for in this
                          8 in. - <12 in.     4                subsection, timber harvesting shall not be
                       12 in. or greater      8                permitted. For purposes of this
                                                               subsection, timber harvesting is defined as
                                                               the cutting and removal of timber for the
L.   Vegetation may be removed in excess of the
                                                               primary purpose of selling or processing
     standards in Subsection 11.4.3(A) of this article
                                                               forest products. The cutting or removal of
     in order to conduct shoreline stabilization of an
                                                               trees in the Shoreland Overlay Zone on a
     eroding shoreline, provided that approval is
                                                               lot that has less than two acres within the
     obtained from the review authority.
                                                               Shoreland Overlay Zone shall not be
     Construction equipment must access the
                                                               considered timber harvesting. Cutting or
     shoreline by barge when feasible as determined
                                                               removal of such trees shall be regulated
     by the review authority. When necessary, the
                                                               pursuant to this subsection.
     removal of trees and other vegetation to allow
                                                          4.   For purposes of this subsection, vegetation
     for construction equipment access to the
                                                               is defined as all live trees, shrubs, and other
     stabilization site via land must be limited to no
                                                               plants including without limitation, trees
     more than 12 feet in width. When the
                                                               both over and under four inches in
     stabilization project is complete the
                                                               diameter, measured at four and one half
     construction equipment accessway must be
                                                               feet above ground level.
     restored to its pre-development state.
                                                          5.   In all areas other than the Resource
     Revegetation must occur in accordance with
                                                               Protection subdistrict, a buffer strip of
     Subsection 11.4.3(C).
                                                               vegetation shall be preserved, except
                                                               where clearance is required for
11.4.3 Vegetation and clearing
                                                               development of permitted uses, within a
A. Clearing or removal of vegetation
                                                               strip of land extending 75 feet, horizontal
     1.   The clearing or removal of vegetation
                                                               distance, from the normal high-water line
          standards of this subsection shall not apply
                                                               of a river, stream, or tributary stream, or
          to those portions of public recreational
                                                               the upland edge of a coastal wetland or
          facilities adjacent to public swimming
                                                               freshwater wetland within the Shoreland
          areas. Cleared areas in these locations shall
                                                               Overlay Zone, in accordance with the
          be limited to the minimum amount
                                                               following:
          necessary.
                                                               a.   There shall be no cleared opening
     2.   In the Resource Protection subdistrict, the
                                                                    greater than 250 square feet in the
          cutting or removal of vegetation shall be
                                                                    forest canopy or other existing CITY OF PORTLAND LAND USE CODE | 11-5 SHORELAND OVERLAY ZONE