C. In the OS-R zone, sewage pumping and                           on-site connections near substations or to
    treatment facilities shall be permitted. Water                the electric grid shall be allowed.
    pumping stations shall be treated as a                   4.   Wind energy systems shall be designed to
    conditional use and subject to the additional                 avoid electromagnetic interference with
    standards of subsection 6.5.6.                                the transmission or reception of radio,
                                                                  telephone, television, microwave,
6.4.40 Warehousing and distribution facilities                    navigational, or similar signals to
A. Warehousing and distribution facilities in the I-            neighboring areas.
    L and I-Lb zones are limited to a maximum of         B. Setbacks
    10,000 square feet in gross floor area.                  1.   Minor ground-mounted wind energy
B. No outdoor storage is permitted as a                           systems shall be set back from all property
    component of warehousing and distribution in                  boundaries and street right-of-way lines by
    the B-4 and I-L/I-lb zones, except for boat                   a distance equal to or greater than 1.1
    storage.                                                      times the total height of the system,
                                                                  measured from the base of the system to
6.4.41 Wind energy systems (major and minor)                      the top of the system at maximum vertical
A. General                                                        rotation. The setback distance shall be
    1.   All wind energy generation equipment shall               measured to the center of the wind
         be approved under a certification program                generator base.
         approved by the U.S. Department of                  2.   Major ground-mounted wind energy
         Energy.                                                  systems shall be set back from all property
    2.   Wind energy systems, including                           boundaries and street right-of-way lines by
         foundations and support structures,                      a distance equal to or greater than 1.5
         electrical connections, control equipment,               times the total height of the system,
         and associated site improvements shall be                measured from the base of the system to
         designed, engineered, and installed to                   the top of the system at maximum vertical
         comply with all applicable local, state, and             rotation. The setback distance shall be
         federal construction and electrical                      measured to the center of the wind
         regulations and Federal Aviation                       generator base.
         Administration regulations. Applicable          C. Height
         state and local approvals shall be obtained         1.   Ground-mounted wind energy systems are
         prior to installation of any wind energy                 limited to a maximum height of 65 feet in
         system.                                                  the B-2/B-2b, B-5, and B-6 zones.
    3.   All on-site electrical wiring associated with       2.   All moving components of a ground-
         the proposed wind energy system shall be                 mounted wind energy system shall be a
         located within the tower/pole/supporting                 minimum of 12 feet from ground level or
         structure or underground. Above ground                   accessible surface. 6-24 | CITY OF PORTLAND LAND USE CODE USE STANDARDS