INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,840 chars
the IDP approval process.                                        i.    A summary of existing resources,
C. Content. The IDP submission shall address the                          such as historic, open space, and
    following elements unless specifically modified                       natural resources.
    by the Planning Authority or Planning Board,                    ii.   A summary of the existing
    with the scope and level of detail to be clarified                    transportation system, including
    at the required scoping meeting:                                      vehicular, pedestrian, transit,
    1.   Context information, including:                                  bicycle, and parking supply,
         a.   The institution’s adopted mission,                         demand, and utilization.
              vision, or purpose statement.                         iii. A summary of existing public
         b.   A summary of relevant baseline data                         infrastructure supporting the
              on the institution, including:                              institution, including demand,
              i. A neighborhood context plan.                           utilization and any capacity issues.
              ii.   An inventory of current programs                iv. Relevant municipal plans,
                   and services.                                          projects, and studies that may
              iii. A current census of the number                         influence the IDP study area and
                    of people using the institution                       opportunities for integrating
                    (e.g., employees, enrollment,                         institutional growth.
                    patients), with an indication of           d.   A summary of public involvement in
                    maximums and minimums over                      the development of the IDP, including
                  time.                                             major areas of public concern.
              iv. An inventory and/or plan of all         2.   Assessment of future institutional growth
                    existing property holdings within          and change, including:
                    the main campus and within the             a.   A description of institutional needs
                    City of Portland, including an                  and areas of future institutional
                    indication of functional land use               growth and change, with:
                    links between off-campus                        i. A projected census of users (e.g.,
                    properties and the main campus                        enrollment /employment/patient/
                    (e.g. remote parking).                                visitor figures and anticipated
              v.    An inventory and/or plan of                           variations over time).
                    existing facilities, including data             ii.   Institutional objectives for
                    on use, floor area, and any                           property both within and outside
                    existing functional connections                       the IOZ boundary (e.g. acquisition
                    between facilities.                                   and/or disposition), including an
         c.   A summary of the baseline                                   indication of any functional land
              characteristics of the existing campus                      use connection for sites outside
              and context of the institution, based                       the IOZ boundary to the main
              on identified study areas, including:                       campus. CITY OF PORTLAND LAND USE CODE | 8-9 OVERLAY ZONES