Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,848 chars
b.   The structure shall be securely                authorize the applicant to build a structure
              anchored to the wharf or pier to resist        to and including the first horizontal floor
              flotation, collapse, and lateral               only above the base flood level. At that
              movement due to the effect of wind             time the applicant shall provide the Code
              and water loads acting simultaneously          Enforcement Officer with an “under
              on all building components.                    construction” elevation certificate (FEMA
         c.   The structure will not adversely               form FF-206-FY-22-152) completed by a
              increase wave or debris impact forces          professional land surveyor based on the
              affecting nearby buildings.                    Part I permit construction, “as built,” for
         d.   The structure shall have unfinished            verifying compliance with the elevation
              interiors and shall not be used for            requirements of Subsections 12.4.5(H), (I),
              human habitation.                              (J), or (R). Following review of the
         e.   Any mechanical, utility equipment and          elevation certificate data, which shall take
              fuel storage tanks must be anchored            place within 72 hours of receipt of the
              and either elevated or floodproofed            application, or as soon as practicable
              to two-feet above the base flood               thereafter, the Code Enforcement Officer
              elevation.                                     shall issue Part II of the Flood Hazard
         f.   All electrical outlets shall be ground         Development Permit. Part II shall authorize
              fault interrupt type. The electrical           the applicant to complete the construction
              service disconnect shall be located on         project.
              shore above the base flood elevation      2.   Flood Hazard Development Permit for
              and when possible outside the special          floodproofing of nonresidential structures.
              flood hazard area. If a flood hazard           This permit shall apply for nonresidential
              permit application is granted, the             structures that are new construction or
              applicant shall be notified in writing         substantially improved nonresidential
              that flood insurance is not available          structures that are not being elevated but
              for structures located entirely over           that meet the floodproofing standards of
              water or seaward of mean high tide.            Subsection 12.4.5(I)(1). The application for
                                                             this permit shall include a floodproofing
12.4.6 Permit                                                certificate signed by a registered
A. Upon determination that the development or                professional engineer or architect.
    substantial improvement plan is in compliance       3.   Flood Hazard Development Permit for
    with this article, the Building Authority shall          minor development. This permit shall
    issue one of the following Flood Hazard                  apply for all other development and
    Development Permits based on the type of                 building permits that are not new
    development:                                             construction or a substantial
    1.   Two-part Flood Hazard Development                   improvement, such as repairs,
         Permit for elevated structures. Part I shall        maintenance, renovations, or additions, 12-16 | CITY OF PORTLAND LAND USE CODE FLOODPLAIN MANAGEMENT