INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

4,001 chars
a convenient location proximate to the                  framework. It shall also be consistent with the
     institution. The applicant shall provide written        IDP, consistent with the Comprehensive Plan,
     notification to property owners of record               and shall meet applicable site plan standards,
     within 500 feet of the proposed IOZ boundary            unless such standards are superseded by the
     at least ten days prior to the meeting dates, and       regulatory framework. Any development
   shall maintain written records of the meetings.           proposed by an eligible institution outside the
C. Required scoping meeting. The eligible                    established IOZ boundary shall be reviewed
     institution shall meet with the Planning                under the standards of the applicable zone ,
     Authority after the first required neighborhood         unless such development is proposed in a
     meeting and prior to submission of the zone             residential zone and is functionally related to
     change application to confirm the focus of the          the operations within the IOZ, in which case it
     Institutional Development Plan (IDP) and                shall be addressed by the IDP and require an
     regulatory framework, including associated              amendment to the IDP as applicable.
     study areas that may be outside of the
     proposed IOZ boundary. The IDP and                  8.3.4 Institutional Development Plan (IDP)
     regulatory framework will vary in detail and        A. Purpose. Any use conducted by an eligible
     focus depending on the eligible institution and         institution and any construction by an eligible
     its context. The content requirements in                institution in an Institutional Overlay Zone shall
     Subsections 8.3.4 and 8.3.5 and the recorded            be consistent with an Institutional
     comments from neighborhood meeting(s) shall             Development Plan (IDP) approved by the
     provide direction for the content of the IDP.           Planning Board in accordance with this section.
     The Planning Authority or Planning Board may            The purpose of the IDP is to establish baseline
     require additional information or modify                data about institutional land uses, facilities, and
     content requirements as is relevant to the              services, and to measure, analyze, and address
   eligible institution.                                     the anticipated or potential impacts of planned
D. Reviewing authority. The Planning Board shall             institutional growth and change. The IDP shall
     review the zone change application, including           serve as a background document that supports
     the IDP and regulatory framework. At least one          the proposed regulatory framework and
     public workshop and a public hearing before            informs subsequent site plan review(s).
     the Planning Board are required. Upon               B. Planning horizon. An IDP shall provide the
     recommendation of the Planning Board, the               City and abutting neighborhoods with a clear
     City Council shall review and consider adoption         outline of the anticipated or potential growth
     of the Institutional Overlay Zone and the               and change of the eligible institution for the
     accompanying regulatory framework as an                 short- to medium-term (e.g. 1-5 and 5-10 years
     amendment to the City’s Code of Ordinances.             respectively), as well as a conceptual growth
E.   Future institutional development. All new               plan for the long-term (e.g. 10 years or more).
     development shall be compliant with the                 However, the specific planning horizons for
     established IOZ and accompanying regulatory             each institution will be determined as part of 8-8 | CITY OF PORTLAND LAND USE CODE OVERLAY ZONES