INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,950 chars
development and for all new construction and                 manufactured home parks divided into two or
substantial improvements shall be paid to the                more lots, assure that:
Building Authority, and a copy of a receipt for the          1.   All such proposals are consistent with the
same shall accompany the application. An                          need to minimize flood damage.
additional fee may be charged if the Code                    2.   All public utilities and facilities, such as
Enforcement Officer, Planning Board, and/or Board                 sewer, gas, electrical and water systems
of Appeals needs the assistance of a professional                 are located and constructed to minimize
engineer or other expert. The expert’s fee shall be               or eliminate flood damages.
paid in full by the applicant within 10 days after the       3.   Adequate drainage is provided so as to
City submits a bill to the applicant. Failure to pay              reduce exposure to flood hazards.
the bill shall constitute a violation of the ordinance       4.   All proposals include base flood elevations,
and be grounds for issuance of a stop work order.                 flood boundaries and, in a riverine
An expert shall not be hired by the City at the                   floodplain, floodway data. These
expense of an applicant until the applicant has                   determinations shall be based on
either consented to such hiring in writing or been                engineering practices recognized by the
given an opportunity to be heard on the subject. An               Federal Emergency Management Agency.
applicant who is dissatisfied with a decision to hire        5.   Any proposed development plan must
expert assistance may appeal that decision to the                 include a condition of plan approval
Board of Appeals.                                                 requiring that structures on lots in the
                                                                  development be constructed in
12.4.4 Review procedure                                           accordance with Subsection 12.4.5 of this
A. Upon determination by the Building Authority                   article. Such requirement shall be included
    that an application is complete, the Building                 in any deed, lease, purchase and sale
    Authority shall coordinate review of the                      agreement, or document transferring or
    application by the City to assure that proposed               expressing an intent to transfer any
    developments are reasonably safe from                         interest in real estate or structure,
    flooding. No permit shall be issued until the                 including but not limited to a time-share
    Building Authority finds that the development                 interest. The condition shall clearly
    proposal is in compliance with the standards of               articulate that the municipality may
    this article. Compliance with the provisions of               enforce any violation of the construction
    this article shall be required prior to beginning             requirement. The construction
    any development as defined herein.                            requirement shall also be clearly stated on
B. The Building Authority shall, when reviewing                   any map, plat, or plan as part of the
    subdivisions under Article 14 and other                       approval process.
    proposed developments that require review            C. In the review of all Flood Hazard Development
    under Article 13 or federal law, state law, or           Permit applications for compliance with the
    local ordinances or regulations and all projects         standards herein:
    on five or more acres, or in the case of                 1.   The Building Authority shall utilize: 12-6 | CITY OF PORTLAND LAND USE CODE FLOODPLAIN MANAGEMENT