INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,471 chars
structural soils as recommended by                   property without creating ponding,
            the City Arborist) shall be required.                flooding or other drainage problems
       b.   Where the applicant can demonstrate                  and that the owner of the lot being
            that site constraints prevent the                    improved has the legal right to
            planting of required street trees in the             increase the flow of stormwater onto
            city right-of-way, the review authority              the adjacent lot or City property.
            may permit an alternative subject to            c.   Any increase in volume or rate of
            the landscaping standards of the                     stormwater draining from the lot into
            Technical Manual.                                    the City’s storm sewer system can be
       c.   Where the proposed development                       accommodated in the system without
            includes the removal of an existing                  creating downstream problems or
            street tree determined by the City                   exceeding the capacity of the storm
            Arborist to be a heritage or feature                 sewer system.
            mature tree, the applicant shall be        2.   All development shall comply with the
            required to contribute to the Tree              stormwater management standards of the
            Fund at the designated rate in the              Technical Manual.
            Technical Manual so that the total         3.   Development shall not pose a risk of
            replacement cost is significantly               groundwater contamination either during
            higher than planting a new street               or post-construction, as described in the
            tree/contributing for a new street tree.        stormwater management and water supply
C. Water quality, stormwater management,                    standards of the Technical Manual.
   and erosion control                                 4.   Applicants shall demonstrate that
   1. All development shall be designed to                  subsurface and/or any adjacent slope
       minimize total area of impervious surface            conditions are suitable to support the
       on the site and both the volume and rate             development, and where determined
       of runoff from the lot. Provisions for               necessary, shall prepare a geotechnical
       stormwater management shall                          study to demonstrate that the
       demonstrate the following:                           development as designed will not adversely
       a.   Any stormwater draining onto or                 impact the development site or any
            across the lot in its pre-improvement           abutting property. Soil surveys and/or
            state will not be impeded or re-                geotechnical studies shall be prepared in
            directed so as to create ponding on,            accordance with the requirements of the
            or flooding of, adjacent lots.                  Technical Manual.
       b.   Any increase in volume or rate of
            stormwater draining from the lot onto
            an adjacent lot or City property
            following the improvement can be
            handled on the adjacent lot or City CITY OF PORTLAND LAND USE CODE | 13-11 SITE PLAN