INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,791 chars
permitting requirements in effect at the           b. Ongoing community engagement shall
          time.                                                 be conducted, including the
     6.   Design of exterior building envelopes will            continuation of neighborhood forums
          be in developed in compliance with the                and maintenance of the Roux Institute
          bird-friendly building and design                     campus website.
          requirements set forth in Article VII-A of         c. A Community Advisory Group shall be
          Chapter 6 of the City of Portland Code of             created for the purpose of sharing
          Ordinances, except that bird safe materials           information on project development,
          must be used for the entire façade of all             planning, and seeking input. To the
       buildings regardless of building height.                 extent practicable, the group shall be
G. Mitigation measures                                          comprised of representatives of
     1.   Site plan impacts to off-premise                      interested groups such as the East
          infrastructure shall be mitigated in a                Deering Neighborhood, East Deering
          manner proportionate to those impacts.                Neighborhood Association, East
          Mitigation may include financial or in-kind           Deering Neighborhood for Responsible
          contributions to existing or planned City             Development, Front Street Area
          projects focused on mitigating the impacts            Neighborhood, a tenant representative
          of the development. Mitigation                        from Portland Housing Authority’s
          contribution shall be determined based on             Washington Gardens and Front Street
          the City’s standard procedure in effect at            developments, recreation, parks and
          the time of site plan review.                         trails, including the Friends of Payson
     2.   Impacts to natural resources shall be                 Park, from sustainability, rail,
          mitigated in accordance with local, state             bicycle/pedestrian, public transit,
          and federal permitting standards in effect            Portland Harbor, Portland Public
       at the time.                                             Schools, including a Presumpscot
H. Design. All buildings within the IOZ shall adhere            School parent, higher education, and
     to the design guidelines set forth in the IDP.             the business community.
I.   Neighborhood integration                                d. A designated community contact shall
     1.   Neighborhood engagement                               be engaged to be the point of contact
          a. For the purposes of keeping                        for providing information to the
             surrounding residential areas apprised             neighborhood and receiving feedback.
             of its future development plans, and to    2.   Construction management. At the time of
             address any neighborhood issues                 site plan review, Northeastern University
             related to the operations of the Roux           shall submit a Construction Management
             Institute campus, the Roux Institute            Plan substantially in accordance with the
             shall adhere to the ongoing                     construction management principles
             neighborhood engagement principles              identified in the Institutional Development
             identified in the IDP.                          Plan for review and approval by the 8-32 | CITY OF PORTLAND LAND USE CODE OVERLAY ZONES