INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

5,007 chars
TABLE 8-F: DIMENSIONAL STANDARDS                                         and supply. Parking studies shall integrate
                      Lot area (min.)   --                                parking and trip reduction achievement
            Street frontage (min.)      --                               and data contained in the TDM Plan.
           Gross floor area (max.)                              F.   Environment. All new buildings and parking
       (Nonresidential uses on the
          ground floor only, unless
                                        --                           facilities proposed by UNE shall integrate with
 otherwise permitted or restricted)                                  the surrounding context to allow connectivity
                     Build-to zone      0–10 ft.                     amongst open space, pedestrian networks, and
           Build-to percentage (min.)   100%                         the Evergreen Cemetery, and to protect the
     Building length as a percentage                                 critical natural resources associated with the
                                        B-2: None
            of street frontage (min.)
                                                                     Capisic Brook watershed. The Planning Board
               Blank wall area (max.)   20 ft.
                                                                     may approve a reduction of the setback
                                        None, except 25 ft.
                                                                     requirement for a new building to the least
                                        if abutting a lot
                        Rear setback                                 amount necessary to achieve the goals of the
                                        outside of the IOZ
                               (min.)
                                        boundary in a                development and minimize overall impacts,
                                        residential zone             provided that the setback is not reduced to less
                                        None, except 5 ft. if      than 40 feet.
               Side setback, interior
                                        abutting a lot in a     G. Mitigation measures
                               (min.)
                                        residential zone
                                                                     1.   Site plan impacts to off-premise
                                        75 ft., or as shown
                    Structure height                                      infrastructure shall be mitigated in a
                                        on the UNE Height
                               (min.)                                     manner proportionate to those impacts.
                                        Map
       Landscaped open space ratio                                        Mitigation may include financial or in-kind
                                        B-2: 10%
                            (min.)                                        contributions to existing or planned City
                                                                          projects focused on mitigating the impacts
E.    Transportation                                                      of the development. Mitigation
      1.    Transportation demand management                              contribution shall be determined based on
            (TDM). At the time of the first site plan                     the City’s standard procedure in effect at
            review following IDP approval, UNE shall                      the time of site plan review.
            submit a campus-wide TDM Plan                            2.   Impacts to natural resources shall be
            substantially in accordance with those                        mitigated in accordance with local, state,
            TDM objectives and strategies identified in                   and federal permitting standards in effect
            the approved IDP. The TDM Plan may be                      at the time.
            phased into short-, mid-, and long- term            H. Design
            actions to allow for progressive                         1.   All new development shall be designed to
            implementation over time.                                     create a cohesive campus character.
      2.    Parking. Parking requirements in the IOZ                 2.   New buildings shall be designed with building
            hall be established at the time of site plan                  entrance(s) and principle facades oriented
            review based on a parking study that                          towards existing campus buildings, open
            includes a campus-wide analysis of demand                     space, streets, and pedestrian pathways. CITY OF PORTLAND LAND USE CODE | 8-35 OVERLAY ZONES