INTERNAL PROTOTYPE โ€” NOT LEGAL ADVICE โ€” DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,706 chars
M. Is or is not in a flood prone area, based on the        14.5 TECHNICAL AND DEVELOPMENT
     Federal Emergency Management Agency's                      STANDARDS
     flood boundary and floodway maps and flood            14.5.1 Technical standards
     insurance rate maps and/or the City of Portland       All subdivisions and associated improvements,
     Coastal Flood Resilience Overlay Zone, and            excluding subdivisions exempted under Section 14.12
     information presented by the applicant. If the        of this article, shall, in addition to the criteria listed
     subdivision, or any part of it, is in such an area,   herein, adhere to all applicable standards of the City
     the subdivider shall determine the 100-year           of Portland Technical Manual, unless formally
     flood elevation and flood hazard boundaries           waived by the Planning Board.
     within the subdivision, and/or the applicable
     SLR-DFE and SLR-BFE per Section 8.1. The              14.5.2 Timing of subdivision improvements
     proposed subdivision plan must include a              The Department of Public Works shall establish the
     condition of plan approval requiring that             sequence in which work is to be accomplished.
     structures in the subdivision will be                 Where it is determined by the Public Works
     constructed in compliance with the provisions         Authority that work has been completed prior to
     of Section 8.1 and Article 12.                        the receipt of all approvals required by this article,
N. Will provide for adequate stormwater                    or which is out of sequence, or is not in compliance
     management as demonstrated by compliance              with the standards of this section and of Chapter 25,
     with the stormwater standards of the City of          the Public Works Authority may issue a stop work
     Portland Technical Manual.                            order. Work shall recommence only after the stop
O. Will not have lots with a lot depth-to-shore            work order has been lifted by the Public Works
     frontage ratio greater than 5 to 1 if any lots in     Authority. Violation of the stop work order shall be
     the proposed subdivision have shore frontage          considered an offense.
     on a river, stream, brook, great pond, or coastal
     wetland as these features are defined in Title 38     14.5.3 Subdivision names
     ยง 480-B. For purposes of this measurement,            Subdivision names for plats shall be subject to
     shore frontage shall be the length of a lot           approval by the Planning Board and shall not
     bordering on a water body or wetland                  duplicate the name of any plat already recorded.
     measured in a straight line between the
     intersections of the lot lines with the shoreline.    14.5.4 Streets
P.   For any proposed subdivision that crosses             A. All streets shall be platted along contour
     municipal boundaries, will not cause                       elevations which result in minimal grade
     unreasonable traffic congestion or unsafe                  changes and ensure the greatest visibility
     conditions with respect to the use of existing             wherever practicable, with consideration given
     public ways in an adjoining municipality in                for anticipated use of the land. Street grades in
     which part of the subdivision is located.                  all proposed subdivisions shall be subject to
                                                                approval by the Public Works Authority. CITY OF PORTLAND LAND USE CODE | 14-5 SUBDIVISIONS