result from strict compliance with these                      e.    The street has been constructed or
    regulations, may vary the regulations so that                       reconstructed without sidewalks
    substantial justice may be done and the public                      within the last 24 months.
    interest secured, provided that such variation                f.    Strict adherence to the sidewalk
    will not have the effect of nullifying the intent                   requirement would result in the loss
    and purpose of the Comprehensive Plan and                           of significant site features related to
    the regulations of this article.                                    landscaping or topography that are
B. Where the Planning Board or Planning                                 deemed to be of a greater public
    Authority finds that, for each of the                               value.
    requirements listed in (1) and (2) below, two or         2.   Curbing
    more of the conditions exist with respect to                  a.    The cost to construct the curbing,
    compliance with the requirements set forth in                       including any applicable street
    Subsection 14.5.4 pertaining to the provision                       opening fees, is in excess of 5% of the
    and construction of curbs and/or sidewalks, it                      overall project cost.
    may waive, in whole or in part, the regulations               b.    The reconstruction of the street is
    so that substantial justice may be done and the                     specifically identified and approved in
    public interest secured.                                            the first or second year of the current
    1.   Sidewalks                                                      Capital Improvement Program or has
         a.   There is no reasonable expectation for                    been funded through an earlier CIP or
              pedestrian usage coming from, going                       through other sources.
              to and traversing the site.                         c.    The street has been rehabilitated
         b.   There is no sidewalk in existence or                      without curbing in the last 60 months.
              expected within 1,000 feet and the                  d.    Strict adherence to the curb
              construction of sidewalks does not                        requirement would result in the loss
              contribute to the development of a                        of significant site features related to
              pedestrian oriented infrastructure.                       landscaping or topography that are
         c.   A safe alternative-walking route is                       deemed to be of a greater public
              reasonably and safely available, for                      value.
              example, by way of a sidewalk on the                e.    Runoff from the development site or
              other side of the street that is lightly                  within the street does not require
              traveled.                                                 curbing for stormwater management.
         d.   The reconstruction of the street is        C. In no event shall the waiver have the effect of
              specifically identified and approved in        creating potentially hazardous vehicle and
              the first or second year of the current        pedestrian conflict or nullifying the intent and
              Capital Improvement Program or has             purpose and policies of the Comprehensive
              been funded through an earlier CIP or          Plan relating to transportation and pedestrian
              through other sources.                         infrastructure and the regulations of this
                                                             article. CITY OF PORTLAND LAND USE CODE | 14-9 SUBDIVISIONS