INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,796 chars
Review process                                       objectives.
Any project within the Fort Sumner Park Overlay          G. Provide a regulatory tool for Portland’s major
shall go before the Parks Commission for a                   institutions that includes the flexibility required
recommendation to the Planning Board regarding               to balance the particular needs of institutions
potential impacts on Fort Sumner Park.                       with the needs of the surrounding
                                                             neighborhood and wider community.
8.3 INSTITUTIONAL OVERLAY (IOZ)
8.3.1    Purpose                                         8.3.2 Location and applicability
The Institutional Overlay Zone (IOZ) provides a          The city’s major medical and higher education
regulatory tool available to the city’s major medical    institutions are eligible to apply for designation as
and higher education campuses where an                   Institutional Overlay Zones. Use of an Institutional
alternative regulatory structure is needed to            Overlay Zone is encouraged for these institutions,
facilitate a consistent, predictable, and clear growth   particularly where proposed future development
management process. The purposes of the                  may be inconsistent with current base zoning.
Institutional Overlay Zone are to:
A. Acknowledge that the city’s major academic            8.3.3 Establishment
     and medical institutions play a prominent role      A. Application for an Institutional Overlay Zone.
     in the health and well-being of the local and           Where an eligible institution seeks designation as
     regional community, and to sustain that role,           an IOZ, they shall submit a zone change
     these institutions need flexibility to change and       application consisting of two components:
     grow.                                                   1.   An Institutional Development Plan (IDP) in
B. Encourage proactive planning for institutional                 accordance with Subsection 8.3.4.
     change and growth which identifies and                  2.   A regulatory framework in accordance
     addresses likely long-term institutional needs               with Subsection 8.3.5. If adopted, this
     and cumulative impacts while leveraging                      framework shall serve as the text and map
     potential benefits at the neighborhood, city,                amendment to the City’s Land Use Code
     and regional level.                                       and zoning map.
C. Ensure that institutional change and growth           B. Required public involvement. At least two
     both complements and, as appropriate,                   neighborhood meetings shall be required to
     integrates adjacent or surrounding                      establish designation as an IOZ. The first shall
     neighborhoods through carefully planned                 be held prior to the formal submission of a
     transitions.                                            zone change application, and the second shall
D. Support the formation and continuation of                 be held during the City’s review. Meetings shall
     mutually beneficial public-private cooperation.         identify the concerns, if any, of affected
E.   Support an ongoing public engagement                    residents and property owners, and should
     process that benefits both the institutions and         solicit feedback to inform the Institutional
     nearby neighborhoods.                                   Development Plan (IDP) and regulatory
F.   Reflect Comprehensive Plan and other policy             framework proposed. Meetings shall be held in CITY OF PORTLAND LAND USE CODE | 8-7 OVERLAY ZONES