equipment will not create a hazard to air          residential zone, except for sound from
         traffic.                                           construction activities, sound from traffic
    2.   Rooftop appurtenances may exceed the               on public streets, sound from temporary
         maximum height limit of 45 feet providing          activities such as festivals, sound created
         that their design and placement is either          as a result of, or relating to, an emergency,
         fully screened or integrated into the              including sound from emergency warning
         architecture of the structure on which             signal devices, and maritime navigation
         they sit.                                          signals.
    3.   The applicant shall provide a                 2.   In measuring sound levels under this
         determination from the Federal Aviation            subsection, sounds with a continuous
         Administration that structures and                 duration of less than 60 seconds shall be
         equipment in excess of 45 feet will not            measured by the maximum reading on a
         exceed the applicable height guidelines for        sound level meter set to the A weighted
         the runway approach and will not create a          scale and the fast meter response (L
         conclusive evidence that the proposed              maxfast). Sounds with a continuous
         development will not create a hazard.              duration of 60 seconds or more shall be
                                                            measured on the basis of the energy
10.2.8 Performance standards                                average sound level over a period of 60
Development in the Eastern Waterfront Port Zone             seconds (LEQ1).
shall comply with the following standards:             3.   In addition to the sound level standards
A. Outdoor storage of materials. Outdoor                    otherwise established, facilities or
    storage of commodities and materials                    operations established or built in the
    accessory to normal conduct of business shall           EWPZ on or after July 1, 1988, shall employ
    be entirely contained, including runoff                 best practicable sound abatement
    contaminants and residual material, within a            techniques to prevent tonal sounds and
   designated area.                                         impulse sounds or, if such tonal and
B. Noise                                                    impulse sounds cannot be prevented, to
    1.   The level of sound, measured by a sound            minimize the impact of such sounds in
         level meter with frequency weighting               residential zones. Tonal sound is defined as
         network (manufactured according to                 a sound wave usually perceived as a hum
         standards prescribed by the American               or which because its instantaneous sound
         National Standards Institute, Inc.),               pressure varies essentially as a simple
         inherently and recurrently generated               sinusoidal function of time. Impulse sounds
         within the EWPZ between the hours of               are defined as sound events characterized
         7:00 p.m. and 7:00 a.m. from facilities or         by brief excursions of sound pressure,
         operations commenced on or after July 1,           each with a duration of less than one
         1988, shall not exceed 55 decibels on the A        second.
         scale at or within the boundaries of any 10-8 | CITY OF PORTLAND LAND USE CODE WATERFRONT ZONES