regeneration occurs within one                  The amount of exposed ground area at every
                 growing season, then native tree                phase of construction shall be minimized to
                 seedlings or saplings shall be replanted        reduce the potential for erosion.
                 on a one-for-one basis.                    D. Any exposed ground area shall be temporarily
                                                                 or permanently stabilized within one week from
11.4.4 Erosion and sedimentation control                         the time it was last actively worked, by use of
A. All activities which involve filling, grading,                riprap, sod, seed, and mulch, or other effective
    excavation or other similar activities which                 measures. In all cases, permanent stabilization
    result in unstabilized soil conditions and which             shall occur within nine months of initial
    require a permit shall require a written soil                exposure. The following standards shall also be
    erosion and sedimentation control plan in                    met:
    accordance with Maine Erosion and Sediment                   1.     Where mulch is used, it shall be applied at
    Control Handbook for Construction: Best                             a rate of at least one bale per 500 square
    Management Practices, published by the                              feet and shall be maintained until a catch
    Cumberland County Soil and Water                                    of vegetation is established.
    Conservation District and the Maine                          2.     Anchoring the mulch with netting, peg, and
    Department of Environmental Protection and                          twine or other suitable method may be
    the City of Portland Technical Manual. The plan                     required to maintain the mulch cover.
    shall be submitted to the review authority for               3.     Additional measures shall be taken where
    approval and shall include, where applicable,                       necessary in order to avoid siltation into
    provisions for:                                                     the water. Such measures may include the
    1.   Mulching and revegetation of disturbed                         use of staked hay bales, and/or silt fences.
         soil.                                              E.   Natural and man-made drainage ways and
    2.   Temporary runoff control features such as               drainage outlets shall be protected from
         hay bales, silt fencing, or diversion ditches.          erosion from water flowing through them.
    3.   Permanent stabilization structures such as              Drainage ways shall be designed and
         retaining walls or riprap.                              constructed in accordance with the City of
B. In order to create the least potential for                    Portland Technical Manual.
    erosion, development shall be designed to fit           F.   When an excavation contractor will perform an
    with the topography and soils of the site. Areas             activity that requires or results in more than
    of steep slopes where high cuts and fills may be             one cubic yard of soil disturbance, the person
    required shall be avoided wherever possible,                 responsible for management of erosion and
    and natural contours shall be followed as                    sedimentation control practices at the site
    closely as possible.                                         must be certified in erosion control practices
C. Erosion and sedimentation control measures                    by the Maine Department of Environmental
    shall apply to all aspects of the proposed                   Protection. This person must be present at the
    project involving land disturbance and shall be              site each day earth-moving activity occurs for a
    in operation during all stages of the activity.              duration that is sufficient to ensure that proper 11-12 | CITY OF PORTLAND LAND USE CODE SHORELAND OVERLAY ZONE