Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,910 chars
b.   If the qualified professional                  3.    Zone AO shall have the lowest floor
               determines that the project may cause                (including basement) elevated above the
               a change, a hydrologic and hydraulic                 highest adjacent grade:
               analysis that meets current FEMA                      a.   At least two feet higher than the
               standards shall be performed.                              depth specified in feet on the Flood
    2.    If the hydrologic and hydraulic analysis                        Insurance Rate Map, or
          performed indicates a change to the base                   b.   At least three feet if no depth number
          flood elevation, zone, and/or the flood                         is specified.
          hazard boundary line, the applicant may              4.    Zone A shall have the lowest floor
          submit a Conditional Letter of Map                         (including basement) elevated:
          Revision (C-LOMR) request to the Federal                   a.   To at least two feet above the base
          Emergency Management Agency for                                 flood elevation utilizing information
          assurance that the as-built project will                        obtained pursuant to Subsections
          result in a change to the Flood Insurance                       12.4.2(J)(1)(b)(i))(), 12.4.4(C), or
          Rate Map. Once the development is                               12.4.4(B)(4), or
          completed, a request for a Letter of Map                   b. In the absence of all data
          Revision (LOMR) shall be initiated; or                          described above, to at
    3.    If the hydrologic and hydraulic analysis                        least two feet above the
          performed show a change to the base                             highest adjacent grade to the
          flood elevation, zone, and/or the flood                         structure.
          hazard boundary line, as soon as                     5.    Zones VE and Coastal AE shall meet the
          practicable, but no later than six months               requirements of Subsection 12.4.5(R).
          after the completion of the project, the       I.    Nonresidential. New construction or
          applicant shall submit the technical data to         substantial improvement of any nonresidential
          FEMA in the form of a Letter of Map                  structure located within:
       Revision request.                                       1.    Zones AE, AO, and AH shall have the
H. Residential. New construction or substantial                      lowest floor (including basement) elevated
    improvement of any residential structure                         to at least two feet above the base flood
    located within:                                                  elevation, or together with attendant utility
   1.    Zones AE, AO, and AH shall have the lowest                  and sanitary facilities shall:
         floor (including basement) elevated to at                   a.   Be floodproofed to at least two feet
         least two feet above the base flood                              above the base flood elevation so that
         elevation.                                                       below that elevation the structure is
   2.    Zones AO and AH shall have adequate                              watertight with walls substantially
         drainage paths around structures on slopes,                      impermeable to the passage of water;
         to guide flood water away from the                          b.   Have structural components capable
         proposed structures.                                             of resisting hydrostatic and CITY OF PORTLAND LAND USE CODE | 12-9 FLOODPLAIN MANAGEMENT