building heights at the center of            2.   Traffic movement permit (TMP)
               campus, mitigating shadow impacts to              a.   Any development that will generate
            adjacent properties.                                      over 100 passenger car equivalents
E.   Transportation                                                   will trigger TMP review which will
     1.   Transportation demand management                            determine applicable mitigation for
          (TDM)                                                       that development program. There are
          a.   At the time of the first site plan review              contributions anticipated to area-wide
               following IDP approval, the developer                  elements to support trip reduction
               shall submit a campus-wide TDM Plan                    targets, such as contribution to the
               substantially in accordance with those                 development of shared use path
               TDM objectives and strategies                          infrastructure and support for
               identified in the approved IDP. The                    additional transit service to the
               TDM Plan may be phased into short-,                    campus. The TMP review may
               mid-, and long term actions to allow                   consider an individual site plan or may
               for progressive implementation over                    cover more than one site plan. Each of
               time.                                                  the TMP submissions and review will
          b.   The TDM Plan shall be designed to                      continue to contemplate capacity for
               provide transportation choice with                     multimodal connections to continue
               the goal of reducing parking demand                    to reduce automobile trips.
               and single-occupancy vehicle trips to             b.   Mode shares and trip reduction
               and from the Roux Institute campus                     targets have been identified in the IDP
               and from the Roux Institute campus                     and will be updated and modified with
               by students, faculty, staff, institutional             each TMP submission as necessary.
               partners, and visitors.                      3.   Bicycle and pedestrian access and safety
          c.   The TDM Plan shall establish parking,             a.   A Transportation, Access, and
               mode share, and trip reduction targets                 Circulation Plan has been provided in
               associated with each phase of                          the IDP. At the time of the first site
               development, as well as a data                         plan review, the developer shall
               collection plan.                                       submit an updated Plan. Where
          d.   Annual monitoring reports will be                      possible, the bicycle and pedestrian
               submitted for the TDM Plan. TDM                        access routes shall connect to
               monitoring reports shall include a                     established bicycle and/or pedestrian
               summary of progress towards targets                    facilities. The developer shall look to
               established in the TDM Plan. If                        establish new bicycle and pedestrian
               deficiencies are identified, they will be              bicycle and/or pedestrian facilities
               resolved in accordance with the site                   where feasible.
               plan approval. CITY OF PORTLAND LAND USE CODE | 8-29 OVERLAY ZONES