Portland Land Use Code

Citation
Portland Land Use Code 2.
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

3,568 chars
2.   Curb and sidewalks                                         year of the current Capital
     a.   All development shall provide curb                    Improvement Program (CIP) or
          and sidewalks along all frontages,                    has been funded through an
          installed to specifications as described              earlier CIP or through other
          in the transportation systems and                     sources.
          street design standards of the                  v.    The street has been constructed
          Technical Manual.                                     or reconstructed without
     b.   Where sidewalks already exist but are                 sidewalks within the last 24
          in substandard condition, they shall be               months.
          repaired or replaced in conformance             vi. Strict adherence to the sidewalk
          with Chapter 25 of the City of Portland               requirement would result in the
          Code of Ordinances and the                            loss of significant site features
          transportation systems and street                     related to landscaping or
          design standards of the Technical                     topography that are deemed to
          Manual                                                be of a greater public value.
     c.   An applicant may request a waiver          d.   An applicant may request a waiver
          from sidewalk installation                      from curb installation requirements if
          requirements if they meet two or                they meet two or more applicable
          more applicable waiver criteria as              waiver criteria as listed below:
          listed below:                                   i.    The cost to construct the
          i.    There is no reasonable                          curbing, including any applicable
                expectation for pedestrian usage                street opening fees, is in excess of
                coming from, going to, and                      5% of the overall project cost.
                traversing the site.                      ii.   The reconstruction of the street
          ii.   There is no sidewalk in existence               is specifically identified and
                or expected within 1000 feet and                approved in the first or second
                the construction of sidewalks                   year of the current CIP or has
                does not contribute to the                      been funded through an earlier
                development of pedestrian-                      CIP or through other sources.
                oriented infrastructure.                  iii. The street has been rehabilitated
          iii. A safe alternative walking route is              without curbing in the last 60
                reasonably available, for example,              months and the proposed use
                by way of a sidewalk on the other               and design of the site does not
                side of the street that is lightly              necessitate the installation of
                traveled.                                       curbing.
          iv. The reconstruction of the street            iv. Strict adherence to the curb
                is specifically identified and                  requirement would result in the
                approved in the first or second                 loss of significant site features CITY OF PORTLAND LAND USE CODE | 13-7 SITE PLAN