INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland Land Use Code

Citation
Portland Land Use Code
Parent Document
Portland Land Use Code
Jurisdiction
Portland (municipal)

Other Sections in This Document (765)

Full Text

4,289 chars
Planning Authority.
J.   Historic preservation
     1.   Historic preservation review. The B&M
          Cannery Building has been designated as a
          local historic landmark. The area of
          designation includes the B&M Cannery
          Building, as well as the area of the former
          Codfish Building and pier. The Historic
          Preservation Board’s review of activity
          within the site of the former Codfish
          Building and pier is limited to review of any
          activity that would require a Certificate of
          Appropriateness that is proposed on a           FIGURE 8-H: UNE IOZ BOUNDARY
          newly constructed pier. A Certificate of
                                                          8.3.8 The University of New England Overlay
          Appropriateness will not be required for
                                                               Zone Regulatory Framework
          the demolition of the Codfish Building or
                                                          A.   Applicability. The regulatory framework shall
          construction of a new pier and related
                                                               apply only to development proposed by the
          infrastructure, including future alterations
                                                               University of New England (UNE) within the
          to the pier structure.
                                                               boundary of the Institutional Overlay Zone
     2.   Required interpretive elements.
                                                               (IOZ) and to which UNE holds right, title, or
          Northeastern University shall include
                                                               interest. The regulatory framework shall not
          interpretive element(s) on top of or within
                                                               apply to any land zoned OS-P. Properties in the
          the surface of the new pier that convey the
                                                               UNE IOZ shall continue to be governed by the
          history and significance of the Codfish
                                                               regulations applicable to the underlying zone
          Building. Prior to construction of said
                                                               except as specifically modified by the
          elements, the University shall submit the
                                                               regulatory framework. The UNE IOZ shall have
          proposal to the Historic Preservation
                                                             the boundaries depicted in Figure 8-H.
          Board for its review and approval. The
                                                          B. Phasing and monitoring
          interpretive elements shall be designed in a
                                                               1.   UNE shall file monitoring reports every five
          manner that does not interfere with the
                                                                    years with the Planning Authority.
          use and functionality of the pier as a
                                                                    Monitoring reports shall ensure that data
          marine passenger facility and for water
                                                                    in the IDP is current and provide a
          access by the Roux Institute and the public.
                                                                    summary of progress on IDP
     3.   100-foot review exemption. The B&M
                                                                    implementation, including details of
          Cannery Building is exempt from
                                                                    acquisitions and divestments since the
          Subsection 13.6.4(E)(2) for review of
                                                                    date of IDP approval. Monitoring reports
          development within 100 feet of a
          landmark. CITY OF PORTLAND LAND USE CODE | 8-33 OVERLAY ZONES