14.7.4 Phased projects                                   14.7.7 Acceptable forms for the performance
If a project is reviewed and approved as a phased               guarantee
project, the corresponding performance guarantee         The performance guarantee, in the amount
may also be phased. A separate performance               approved by the Planning Authority, shall be a letter
guarantee shall be posted for each phase. Each           of credit, an escrow account with a responsible
phase of such project shall be independent of            financial institution, or the deposit to the City of
subsequent phases and shall conform to all               Portland Finance Department and shall be in
standards of this article in the event that              conformance with the templates and forms made
subsequent phases do not go forward.                     available by the City. If the performance guarantee
                                                         is a deposit to the City, the City shall hold such
14.7.5 Advanced site work                                funds in a noninterest-bearing account until criteria
On a case-by-case basis, permission for advanced         for performance guarantee release have been
site work may be granted by the Planning Authority.      satisfied. The performance guarantee shall be in the
Such permission is solely within the discretion of       name of the City and shall be approved by the
the Planning Authority.                                  Finance Director as to financial sufficiency and the
                                                         Corporation Counsel as to proper form and legal
14.7.6 Alterations to pending subdivisions               sufficiency.
Alterations may be made to a site with a pending
subdivision application if:                              14.7.8 Reductions of the performance guarantee
A. At minimum, a performance guarantee for the           A. Up to three times during the construction of a
    proposed site alterations has been posted and            project, upon request of the subdivider, a
    final plans have been submitted to the Planning          performance guarantee may be reduced by the
    Authority.                                               value equal to the estimated cost of the
B. Written permission has been received from the             completed improvements. In no case shall any
    Planning Authority that such site alterations may        performance guarantee be reduced by any line
    proceed pending subdivision approval. Such               item on the cost estimate where improvements
    permission is solely within the discretion of the        remain to be completed. Requests shall be
    Planning Authority and shall be granted only             submitted on a form provided by the City for
    after submission of a written request setting            review and approval by the Planning Authority.
    forth the work proposed to be done on the site.      B. In no case shall any performance guarantee be
    All such work shall be done in compliance with           reduced to an amount equal to or less than the
    information provided with the subdivision                required defect guarantee until all criteria set
    application. An erosion control plan shall also be       forth for converting to the defect guarantee
    submitted when deemed necessary by the                   have been met, as approved by the Planning
    Planning Authority. Such written permission shall        Authority.
    not be required when the only work proposed is
    the digging of test pits. CITY OF PORTLAND LAND USE CODE | 14-11 SUBDIVISIONS