of construction, and the premises shall be                   maximum of 30 days per event and a
          restored to their pre-construction state.                    minimum of 30 days between events.
     4.   Temporary contractor’s yards shall be                   e.   Temporary outdoor sales events in
          screened on all sides by a fence a minimum                   any nonresidential zone must be
          of six feet in height to a maximum of eight                  located a minimum of 125 feet from a
          feet in height. Fencing shall not be                         residential zone.
          required on shared lot lines if the abutting
          lot contains a fence or other barrier that
        prohibits entry onto the lot.                    F.   Temporary outdoor storage containers
E.   Temporary outdoor sales                                  The use of an outdoor storage container is
     1.   Temporary outdoor sales in residential              limited to a maximum of 90 days per calendar
          zones are limited to those events                   year, and shall be exempt from temporary use
          conducted by and located on the premises          permit requirements.
          of a place of assembly, an elementary,         G. Additional temporary uses. In addition to the
          middle, or secondary school, or a post-             temporary uses listed above, a temporary use
          secondary school, and shall be exempt               permit may be issued by the Planning Authority
          from temporary use permit requirements.             or Building Authority for other temporary uses
     2.   Time limits shall be as follows:                    that are substantially similar to a temporary use
          a.   Time limitations apply to the lot, not         listed above. A permit may be issued if the
               the operator of the use.                       Planning Authority determines that such use is
          b.   Temporary outdoor sales events in              compatible with the surrounding land uses and
               residential zones are limited to three         proper care has been taken to address
               events per calendar year, with a               potential impacts to surrounding land uses. The
               maximum of either three consecutive            time limit of such temporary use will be
               days, or two consecutive weekends. A           determined and approved as part of the
               minimum of 30 days between events              temporary use permit.
               is required.
          c.   Temporary outdoor sales events in         6.8 PERFORMANCE STANDARDS
               nonresidential zones are limited to       All uses shall comply with the performance
               four events per calendar year, with a     standards established in this section, unless any
               maximum duration of five days per         federal, state, or local law, ordinance, or regulation
               event, and a minimum of 30 days           establishes a more restrictive standard, in which
               between events.                           case the more restrictive standard shall apply.
          d.   Temporary outdoor sales events for
               seasonal sales, such as Christmas trees   6.8.1 Development in the OS-R and OS-P zones
               or pumpkins, are limited to four          All development in the OS-R and OS-P zones shall
               events per calendar year, with a          comply with the following development standards: 6-34 | CITY OF PORTLAND LAND USE CODE USE STANDARDS