all construction or development related to the            and duration of blasting operations, description of
permitted operation. The permittee shall then be          the blasting signals to be used during operations,
required to submit a revised blasting plan to the         the complaint protocol and the complete address,
Planning Authority for review and approval. Work          telephone numbers and email contact for the
shall not be allowed to continue until the revised        blasting contractor, the Planning Authority, and Fire
blasting plan is approved.                                Department where neighbors and property owners
                                                          may request further information and notification.
22.6 PENALTIES
In addition to the possibility of a stop work order in    22.7.3 Additional noticing requirements
the event of a violation, the permittee shall be          A.   For medium blasts where 50-300 cubic yards of
subject to the following penalties:                            rock material is to be removed, and large blasts
1st offense                  $500                              where over 300 cubic yards of rock material is
2nd offense                  $1,000                            to be removed, additional notification
Subsequent offenses          $1,000                            requirements shall apply during construction,
                                                               as detailed in Section 3 of the City of Portland
22.7 NOTICE REQUIREMENTS                                       Technical Manual.
22.7.1 Basic noticing requirements                        B.   If blasting operations are to occur within 250
At least 10 days prior to the start of any blasting            feet of any structure, additional notification
operation, notice shall be published in a newspaper            requirements shall apply, as detailed in Section
of local publication and shall be mailed by first class        3 of the City of Portland Technical Manual, in
mail to all property owners within the distance                order to prevent adverse public health and
specified below of the perimeter of the blasting site:         safety impacts due to blasting-related carbon
A.   Small blast (trench blast or under 50 cubic               monoxide migration.
     yards of rock removed). All property owners
     within 250 feet of the perimeter of the blasting     22.8 HOURS OF BLASTING
     site.                                                Blasting shall occur Monday through Friday,
B.   Medium blast (removal of 50-300 cubic yards          between the hours of 9 a.m. and 4 p.m., unless
     of rock material). All property owners within        otherwise approved by the Planning Authority.
     500 feet of the perimeter of the blasting site.      Requests for extension of hours of blasting must be
C.   Large blast (removal of over 300 cubic yards         submitted by the applicant in writing.
     of rock material). All property owners within
     600 feet of the perimeter of the blasting site.      22.9 WAIVERS
                                                          Upon written request by the applicant, the Planning
22.7.2 Content of notice                                  Authority, based on a positive recommendation by
Notice shall conform to the model notice contained        the Fire Department, may waive all or a portion of
in Section 3 of the City of Portland Technical            the blasting provisions of Section 3 of the City of
Manual and shall include a description of the             Portland Technical Manual, provided that all waivers
proposed blasting operations, estimated schedule 22-2 | CITY OF PORTLAND LAND USE CODE REGULATION OF EXPLOSIVES are consistent with the purposes set forth in
Section 22.1.