INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland City Code ch. 14

Citation
Portland City Code ch. 14
Parent Document
Portland City Code ch. 14
Jurisdiction
Portland (municipal)

Other Sections in This Document (541)

Full Text

4,105 chars
written notice to the operator within seven          violation within one working day of the
          working days of the complaint.                       violation. The Building Authority shall confirm
     2.   In the event that 10 complaints are                  this notification in writing within seven working
          confirmed as set forth in paragraph (1)              days of this initial notice. In the event that the
          above in two separate 24-hour periods                Building Authority is unable to contact the
          within a 90-day period, the Building                 owner or operator by telephone or in person
          Authority shall cause a certified odor               within the required time period, then it will
          inspector to investigate any odor                    send written notification within seven working
          complaints received in the next 30 days              days of the violation.
          following the receipt of the tenth              C.   Upon receipt of the written notice of violation,
          confirmed complaint from the second 24               the owner or operator of the odor source shall
          hour period. If the odors remain under the           do the following:
          ambient intensity standard as established            1.   Implement odor reduction procedures
          in this subsection for the next 30 days,                  immediately upon notification by the
          then a new odor nuisance must be                          Building Authority that the facility has
          established after that time in accordance                 violated this subsection wherever odor
          with the requirements of this subsection.                 reduction can be achieved by operational
          The certified odor inspector shall do the                 or procedural changes at the facility.
          following in response to a complaint under           2.   Submit to the Building Authority, within 30
          this subsection:                                          days of the written notice of violation, an
          a.   Verify that an odor is detectable in the             odor reduction plan which is designed to
               area of the complaint and confirm                    reduce ambient odors attributable to
               that it is the odor that resulted in the             emissions from that source to the
               complaint.                                           maximum allowable intensity for that zone.
          b.   Quantify the intensity of the odor on                The plan shall include a detailed summary
               the eight point in butanol intensity                 of the measures that the owner or
               scale as defined in regulations                      operator will take to mitigate the
               promulgated by the Planning & Urban                  community annoyance and estimated
               Development Director to establish                    dates for completion of those measures. In
               training and technical standards to                  the event that it will take longer than 30
               support this subsection.                             days to develop the odor reduction plan,
          c.   Track the odor to its source.                        the owner or operator of the facility shall
B.   When the certified odor inspector determines                   submit within the 30-day time period a
     that a violation has occurred because an odor                  schedule for the development of the odor
     has exceeded the maximum ambient odor                          reduction plan. The Building Authority shall
     levels set forth in this subsection, the Building              review this plan to determine whether it
     Authority shall notify the owner or operator                   will be adequate to resolve the odor
     either by telephone or in person of the                        nuisance in a reasonable time period. CITY OF PORTLAND LAND USE CODE | 6-43 USE STANDARDS