INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland City Code ch. 14

Citation
Portland City Code ch. 14 10.
Parent Document
Portland City Code ch. 14
Jurisdiction
Portland (municipal)

Other Sections in This Document (541)

Full Text

4,073 chars
10.4.6 Dimensional requirements                             applicable), an impact mitigation narrative
In addition to the generally applicable provisions of       summarizing how the project meets the applicable
Section 7.5 of this Land Use Code, lots in the              performance standards. All uses in the Waterfront
Waterfront Port Development Zone shall be subject           Port Development Zone shall comply with the
to the requirements of Table 10-B.                          following standards:
                                                            A.   Outdoor storage of materials. Outdoor
10.4.7 Additional bulk, height, and location                     storage of commodities and materials
     standards.                                                  accessory to normal conduct of business,
A.   For structures exceeding the maximum                        except pilings and/or cranes, shall be permitted
     applicable height allowed under the permitted               to a maximum height of 45 feet, and such
     use dimensional standards:                                  materials shall be entirely contained, including
     1.   Moveable elements such as cranes and                   runoff contaminants and residual material,
          gantries, and connection devices such as               within a designated area within the lot
          conveyors or bridges shall not be subject              boundaries.
          to the space and bulk requirements, but           B.   Noise.
          shall be subject to a determination by the             1.   The level of sound, measured by a sound
          Federal Aviation Administration that the                    level meter with frequency weighting
          location of such equipment will not create                  network (manufactured according to
          a hazard to navigation.                                     standards prescribed by the American
     2.   The applicant must provide a                                National Standards Institute, Inc.),
          determination from the Federal Aviation                     inherently and recurrently generated
          Administration that structures and                          within the Waterfront Port Development
          equipment will not exceed the applicable                    Zone between the hours of 7:00 p.m. and
          height guidelines for the runway approach                   7:00 a.m. from industrial facilities or
          and will not create a hazard to navigable                   operation commenced on or after July 1,
          airspace. Such a determination shall be                     1988, shall not exceed 55 decibels on the A
          accepted as conclusive evidence that the                    scale at or within the boundaries of any
          proposed development will not create a                      residential zone, except for sound from
          hazard.                                                     construction activities, sound from traffic
     3.   For each lot, at least one view corridor of                 on public streets, sound from temporary
          at least 90 feet in width shall be left unbuilt             activities such as festivals, and sound
          to preserve a clear line of sight between                   created as a result of, or relating to, an
          West Commercial Street and the water.                       emergency, including sound from
                                                                      emergency warning signal devices.
10.4.8 Performance standards                                     2.   In measuring sound levels under this
Proposals in the Waterfront Port Development                          subsection, sounds with a continuous
Zone that qualify for site plan review shall submit, in               duration of less than 60 seconds shall be
addition to site plan submission requirements (if                     measured by the maximum reading on a CITY OF PORTLAND LAND USE CODE | 10-25 WATERFRONT ZONES