Portland City Code ch. 14

Citation
Portland City Code ch. 14
Parent Document
Portland City Code ch. 14
Jurisdiction
Portland (municipal)

Other Sections in This Document (541)

Full Text

3,975 chars
when the only work proposed is the                       been met, as approved by the Planning
         digging of test pits.                                    Authority.
G. Acceptable forms of performance guarantee.           I.   Extension of the performance guarantee. If
    The performance guarantee, in the amount                 the Planning Authority and/or the Public Works
    approved by the Planning Authority, shall be a           Authority has reasonable doubt concerning the
    letter of credit, an escrow account with a               stability or proper construction of the required
    responsible financial institution, or the deposit        site improvements, the developer shall be
    to the City of Portland Finance Department and           required to reconstruct or otherwise address
    shall be in conformance with the templates and           the issues to the City’s satisfaction. If the
    forms made available by the City. If the                 performance guarantee is scheduled to expire
    performance guarantee is a deposit to the City,          before the extent or necessity for such further
    the City shall hold such funds in a noninterest          work can be determined, the developer shall be
    bearing account until criteria for performance           required to extend the performance guarantee
    guarantee release have been satisfied. The               covering such improvements, or secure a new
    performance guarantee shall be in the name of            guarantee, for a period and amount deemed
    the City and shall be approved by the finance            necessary by the Planning Authority and/or the
    director as to financial sufficiency and the             Public Works Authority.
    corporation counsel as to proper form and           J.   Performance guarantee release/conversion
    legal sufficiency.                                       to defect guarantee.
H. Performance guarantee reductions.                         1.   No performance guarantee shall be
    1.   Up to three times during the construction                released until all fees generated by the
         of a project, upon request of the                        project are paid to the City, including but
         developer, a performance guarantee may                   not limited to engineering, inspection, and
         be reduced by the value equal to the                     administrative fees. The guarantor shall
         estimated cost of the completed                          not be released from the guarantee except
         improvements. In no case shall any                       and until authorized in writing by the
         performance guarantee be reduced by any                  Planning Authority.
         line item on the cost estimate spreadsheet          2.   For roadway extension projects, no
         where improvements remain to be                          performance guarantee shall be released
         completed. Requests shall be submitted on                until the Department of Public Works has
         the cost estimate spreadsheet for review                 performed a final inspection of the
         and approval by the Planning Authority.                  roadway and determined satisfactory
    2.   In no case shall any performance                         completion of the required improvements.
         guarantee be reduced to an amount equal                  Additionally, no performance guarantee
         to or less than the required defect                      shall be released until the City in receipt of
         guarantee until all criteria set forth for               a petition for street acceptance, deemed
         converting to the defect guarantee have                  complete and satisfactory by Corporation
                                                                  Counsel and/or the Department of Public 14-22 | CITY OF PORTLAND LAND USE CODE SITE PLAN