INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland City Code ch. 14

Citation
Portland City Code ch. 14
Parent Document
Portland City Code ch. 14
Jurisdiction
Portland (municipal)

Other Sections in This Document (541)

Full Text

3,593 chars
ii.    An inventory of current programs                 iv. Relevant municipal plans, projects,
            and services.                                            and studies that may influence
     iii.   A current census of the number                           the IDP study area and
            of people using the institution                          opportunities for integrating
            (e.g., employees, enrollment,                            institutional growth.
            patients), with an indication of            d.   A summary of public involvement in
            maximums and minimums over                       the development of the IDP, including
            time.                                            major areas of public concern.
     iv. An inventory and/or plan of all           2.   Assessment of future institutional growth
            existing property holdings within           and change, including:
            the main campus and within the              a.   A description of institutional needs
            City of Portland, including an                   and areas of future institutional
            indication of functional land use                growth and change, with:
            links between off-campus                         i.      A projected census of users (e.g.,
            properties and the main campus                           enrollment /employment/patient/
            (e.g. remote parking).                                   visitor figures and anticipated
     v.     An inventory and/or plan of                              variations over time).
            existing facilities, including data              ii.     Institutional objectives for
            on use, floor area, and any                              property both within and outside
            existing functional connections                          the IOZ boundary (e.g. acquisition
            between facilities.                                      and/or disposition), including an
c.   A summary of the baseline                                       indication of any functional land
     characteristics of the existing campus                          use connection for sites outside
     and context of the institution, based                           the IOZ boundary to the main
     on identified study areas, including:                           campus.
     i.     A summary of existing resources,                 iii.    A development plan addressing
            such as historic, open space, and                        anticipated or potential
            natural resources.                                       institutional needs and physical
     ii.    A summary of the existing                                improvements, including the
            transportation system, including                         proposed boundary of the IOZ
            vehicular, pedestrian, transit,                          and any phasing of the
            bicycle, and parking supply,                             development.
            demand, and utilization.                    b.   Analysis and associated plans that
     iii.   A summary of existing public                     address the following elements in
            infrastructure supporting the                    terms of anticipated growth or
            institution, including demand,                   potential impacts within the identified
            utilization and any capacity issues.             study area, and support the CITY OF PORTLAND LAND USE CODE | 8-7 OVERLAY ZONES