INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Portland City Code ch. 14

Citation
Portland City Code ch. 14
Parent Document
Portland City Code ch. 14
Jurisdiction
Portland (municipal)

Other Sections in This Document (541)

Full Text

4,034 chars
outages (freewheeling). If after installation,                  not limited to concerts, parades,
          the system is determined to be operating                        sporting events, and fireworks
          at levels above these limits (as measured at                    displays.
          the property lines in accordance with this
          provision and applicable technical               6.8.10 Odor
          standards, the owner shall take (at the          A.   It shall be a violation of this article to create an
          owner’s cost) remedial action to ensure               odor nuisance.
          compliance with these limits. Required                1.   An odor nuisance shall be considered to
          action may include relocation or removal                   exist when 10 confirmed complaints occur
          of the system.                                             in an area within two separate 24-hour
F.   Exemptions                                                      periods. The 10 confirmed complaints
     1.   Noises created by construction and                         must originate from 10 different
          maintenance activities between 7:00 a.m.                   households in an area zoned residential or
          and 10:00 p.m. are exempt from the                         from 10 different individuals in a
          maximum permissible sound levels set                       commercial or industrial facility. The
          forth above. Construction activities on a                  Building Authority shall only respond to a
          site abutting any residential use between                  complainant who confirms that the odor is
          the hours of 10:00 p.m. and 7:00 a.m. shall                detectable at the time of the actual
          not exceed 50 dBA.                                         complaint. In order to confirm a complaint,
     2.   The following uses and activities shall also               the Building Authority or its designee shall
          be exempt from the requirements of Table                   first determine that an odor is detectable
          6-G:                                                       in the area of the complaint. The Building
          a.     The noises of safety signals, warning               Authority or its designee shall interview
                 devices, emergency pressure relief                  the complainant to verify that the
                 valves, and any other emergency                     detectable odor is in fact the odor that
                 devices.                                            resulted in the complaint. If the
          b.     Traffic noise on public roads or noise              complainant verifies the odor as the
                 created by aircraft and railroads.                  source of the complaint, then the Building
          c.     Noise created by refuse and solid                   Authority shall notify the owner or
                 waste collection, provided that the                 operator of the alleged odor source either
                 activity is conducted between 6:00                  in person or by telephone within one
                 a.m. and 7:00 p.m.                                  working day, with a written confirmation
          d.     Emergency construction or repair                    within seven working days of the
                 work by public utilities, at any hour.              complaint. In the event that the Building
          e.     Noise created by any recreational                   Authority is unable to contact the owner
                 activities which are permitted by law               or operator of the alleged odor source in
                 and for which a license or permit has               person or by telephone within one working
                 been granted by the City, including but             day, then the Building Authority shall send 6-42 | CITY OF PORTLAND LAND USE CODE USE STANDARDS