8.10.4 Conditional uses                                D. Maximum impervious surface ratio. A
The following uses are permitted as provided in             maximum of 66% of the total land area within
Section 6.5:                                                the University of Southern Maine Overlay Zone,
A.   Minor wind energy systems, subject to the              exclusive of public streets, shall be impervious.
     standards of Subsection 6.4.18.                   E.   Maximum coverage by buildings. 40% of the
                                                            total land area within the University of
8.10.5 Dimensional requirements                             Southern Maine Overlay Zone, exclusive of
University buildings and structures shall be subject        public streets, shall be covered by building
to the dimensional requirements of the underlying           footprint.
zone, except as follows:
A.   Minimum setbacks. Minimum setbacks shall be       8.10.6 Parking
     the same as in the underlying zone, except as     The amount of parking required for any university
     shown on the University Campus Overlay            building or building addition shall be determined by
     Setback Map, incorporated herein by reference.    the Planning Board during site plan review, based on
     Side and rear setbacks shall not be required      an analysis of campus-wide parking demand and
     between buildings on contiguous lots owned by     supply, pursuant to a comprehensive university
     the university on the condition that such         parking management plan, and treating all
     contiguous lots shall be considered merged and    contiguous land (including land on opposite sides of
     shall not be separately conveyed unless           the street) owned by the university as one lot. In
     required setbacks in the underlying zones are     determining the amount of parking required for any
     provided.                                         university building, the Planning Board may take into
B.   Maximum building height. Maximum building         account such factors as:
     height shall be the same as in the underlying     A.   The availability of off-campus parking and
     zone, except as shown on the University                shuttle transportation to and from such off-
     Campus Overlay Height Map, incorporated                campus facilities.
     herein by reference.                              B.   The ratio of commuter students to resident
C.   Minimum building height. All new                       students.
     freestanding buildings in height zone B and       C.   The use of centrally located on-campus parking
     height zone C must be built to a height of at          facilities so situated that students, faculty, staff
     least 35 feet or designed and constructed so           and visitors arriving on campus can reasonably
     that they can be expanded to 35 feet or higher.        be expected to park in the central facilities and
     As used in this paragraph, the term “new               walk to their various on-campus destinations
     freestanding building” means any building              during the course of a school day.
     which is not an addition to or expansion of a     D. Shared use of a single parking facility by two or
     building which existed on the date of                  more buildings when the peak parking demand
     enactment of the University of Southern Maine          period for such buildings do not overlap.
     Overlay Zone.                                     E.   Development and implementation of a parking