and water loads acting simultaneously                obtained pursuant to Subsections
             on all structural components. Water                  12.4.2(D)(2), 12.4.4(B)(4), or 12.4.4(C)(1).
             loading values used shall be those         O. Wharves, piers, and docks. New construction
             associated with the base flood.                 or substantial improvement of wharves, piers,
N. Containment walls. New construction or                    and docks are permitted in Zones A, A1-30, AE,
    substantial improvement of any containment               AO, AH, V1-30, and VE, in and over water and
    wall shall meet the following requirements by            seaward of the mean high tide if the following
    zone:                                                    requirements are met:
    1.   Zones A1-30, AE, AH, V1-30, and VE shall            1.   Wharves, piers, and docks shall comply
         have the containment wall elevated to at                 with all applicable local, state, and federal
         least two feet above the base flood                      regulations.
         elevation, have structural components               2.   Commercial wharves, piers, and docks
         capable of resisting hydrostatic and                     involving fill shall adhere to the design and
         hydrodynamic loads and the effects of                    construction standards contained in the
         buoyancy, and be certified by a registered               U.S. Army Corps of Engineers’ Shore
         professional engineer or architect that the              Protection Manual.
         design and methods of construction are in      P.   Coastal flood plains
         accordance with accepted standards of               1.   All new construction located within Zones
         practice for meeting the provisions of this              A1-30, AE, A, V1-30, and VE shall comply
         section. Such certification shall be                     with all applicable local, state, and federal
         provided with the application for a Flood                regulations.
         Hazard Development Permit, as required              2.   New construction or substantial
         by Subsection 12.4.2.                                    improvement of any structure located
    2.   Zones AO and AH shall have adequate                      within Zones V1-30 or VE shall be elevated
         drainage paths around containment walls                  on posts or columns such that:
         on slopes, to guide flood water away from                a.   The bottom of the lowest horizontal
         the proposed walls.                                           structural member of the lowest floor
    3.   Zone AO shall have the top of the                             (excluding the pilings or columns) is
         containment wall elevated above the                           elevated to two feet above the base
         highest adjacent grade at least two feet                      flood elevation.
         higher than the depth specified in feet on               b.   The pile or column foundation and the
         the community’s flood insurance rate map,                     elevated portion of the structure
         or at least three feet if no depth number is                  attached thereto is anchored to resist
         specified.                                                    flotation, collapse, and lateral
    4.   Zone A shall have the containment wall                        movement due to the effects of wind
         elevated to at least two feet above the                       and water loads acting simultaneously
         base flood elevation utilizing information                    on all building components. 12-10 | CITY OF PORTLAND LAND USE CODE FLOOD PLAIN MANAGEMENT