Skip to main content
INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Worcester Zoning Ord. art. IV

Citation
Worcester Zoning Ord. art. IV
Parent Document
Worcester Zoning Ord. art. IV
Jurisdiction
Worcester (municipal)

Other Sections in This Document (1154)

Full Text

417 chars
a) Project Overview: A narrative describing the proposed WECF including an
   overview of the project with the following information: the project location, the
   number, representative types, generating capacity, cut-in and cut-out wind speed,
   overspeed controls, materials, dimensions and respective manufacturers of each
   wind turbine to be constructed, and a detailed description of all ancillary facilities.