Skip to main content
INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Worcester Zoning Ord. art. IV

Citation
Worcester Zoning Ord. art. IV
Parent Document
Worcester Zoning Ord. art. IV
Jurisdiction
Worcester (municipal)

Other Sections in This Document (1154)

Full Text

884 chars
a) Project Overview: A narrative describing the proposed WECF including an
           overview of the project with the following information: the project location, the
           number, representative types, generating capacity, cut-in and cut-out wind speed,
           overspeed controls, materials, dimensions and respective manufacturers of each
           wind turbine to be constructed, and a detailed description of all ancillary facilities.
           This overview shall also include a comparison of estimated electric generation vs.
           on-site electric consumption, a cost-benefit analysis demonstrating that the
           proposed hub height and turbine height are necessary to achieve economic viability
           (including the variation of electricity generated at alternative heights), and an
           estimate of the number of tons of pollution prevented.