Skip to main content

Portland City Code ch. 14 (Land Use Code)

Citation
Portland City Code ch. 14 (Land Use Code)
Jurisdiction
Portland (municipal)
Source
Official source

Related Parts of This Source

Full Text

1,189 chars
areas, grading, and fencing.
unless otherwise approved by the Planning
Board. 14.8 CONSTRUCTION RECORDS AND
I. Street lighting shall be installed in accordance INSPECTION
with the standards of the Public Works 14.8.1 Inspection of construction
Authority. The City shall have the right to enter and inspect
J. A public water supply shall be installed subject the construction site during all phases of the
to the approval of the Portland Water District. project to ensure compliance with this article.
K. Erosion control measures shall be taken both
during and after construction in accordance 14.8.2 Required construction records
with the standards of the Public Works After approval of the subdivision plat and prior to
Authority. the construction of any of the subdivision's public
improvements, the subdivider shall supply the City
14.7.12 Acceptable forms for the defect Engineer with a complete set of engineering
guarantee drawings showing all streets, sanitary sewers, and
The defect guarantee, 10% of the original surface water drains, and all appurtenant work
performance guarantee amount approved by the within the subdivision.
Planning Authority, shall be a letter of credit, an