completed, the reasons why such
to the City a site plan improvement inspection fee improvements have not been completed,
equal to two percent of the estimated costs of and the cost and time to complete the
required site improvements for which a remaining work. In no event shall any
performance guarantee is to be posted. At the temporary or permanent certificate of
conclusion of the project, and before a temporary occupancy be issued where:
or permanent certificate of occupancy is issued, the a. Conditions exist which would justify
developer shall pay to the City the balance of any denial of a certificate of occupancy
inspection fees actually incurred by the City in its under Chapter 6 of the City of
review of the project. Portland Code of Ordinances.
b. Required improvements to the City
13.10.4 As-built plans right-of-way remain to be completed
Upon completion of a development (excluding by the developer.
single- and two-family development and minor site c. Access roads, driveways, and
work as determined by the Planning Authority), the pedestrian access required for the
building or building(s) for which the