Skip to main content

Portland City Code ch. 14 (Land Use Code)

Citation
Portland City Code ch. 14 (Land Use Code)
Jurisdiction
Portland (municipal)
Source
Official source

Related Parts of This Source

Full Text

819 chars
before any hazard of lost canopy.
tree can be removed within the b. Outside of the shoreline buffer, if the
Shoreland Overlay Zone. removal of storm damaged trees
e. The Building Authority or City Arborist exceeds 40% of the volume of trees
may require more than a one–for-one four inches or more in diameter,
replacement for hazard trees removed measured at four and one half feet
that exceed eight inches in diameter above the ground level in any 10 year
measured at four and one half feet period, or results, in the aggregate, in
above the ground level. cleared openings exceeding 25% of
2. Storm-damaged trees in the Shoreland the lot area within the Shoreland
Overlay Zone may be removed without a Overlay Zone or 10,000 square feet,
permit after consultation with the Building whichever is greater, and no natural