Skip to main content

Portland City Code ch. 14 (Land Use Code)

Citation
Portland City Code ch. 14 (Land Use Code)
Jurisdiction
Portland (municipal)
Source
Official source

Related Parts of This Source

Full Text

891 chars
Inland Fisheries and
generator base. Wildlife and the Maine Natural Area
2. Major ground-mounted wind energy Program have been notified of the
systems shall be set back from all property location, height, and design of the
boundaries and street right-of-way lines by proposed wind energy system at least
a distance equal to or greater than 1.5 three weeks prior to any final
times the total height of the system, determination under this subsection. Any
measured from the base of the system to comments received therefrom shall be
the top of the system at maximum vertical addressed to the satisfaction of these state
rotation. The setback distance shall be authorities prior to any final determination
measured to the center of the wind under this provision.
generator base. 3. The support structure (e.g. tower, pole)
for ground-mounted wind generating
systems shall not be climbable for a