Skip to main content

Portland City Code ch. 14 (Land Use Code)

Citation
Portland City Code ch. 14 (Land Use Code)
Jurisdiction
Portland (municipal)
Source
Official source

Related Parts of This Source

Full Text

1,796 chars
maxfast). Sounds with a continuous unless permitted by the Maine Department of
duration of 60 seconds or more shall be Environmental Protection under a waste
measured on the basis of the energy discharge license and as approved by the
average sound level over a period of 60 Department of Public Works in accordance
seconds (LEQ1). with Chapter 24, Article III of the City of
3. In addition to the sound level standards Portland Code of Ordinances. All private
otherwise established, facilities or sewage disposal or private wastewater
operations established or built in the treatment facilities shall comply with the
Waterfront Port Development Zone on or provisions of Chapter 24, Article II of the City of
after July 1, 1988, shall employ best Portland Code of Ordinances and federal and
practicable sound abatement techniques state environmental statutes and regulations
to prevent tonal sounds and impulse regarding wastewater discharges.
sounds or, if such tonal and impulse F. Storage of vehicles. Storage of any
sounds cannot be prevented, to minimize unregistered automotive vehicle on the
the impact of such sounds in residential premises for more than 60 days shall not be
zones. Tonal sound is defined as a sound permitted.
wave usually perceived as a hum or which G. Landfill of docking and berthing areas.
because its instantaneous sound pressure Landfill of docking and berthing areas shall be
varies essentially as a simple sinusoidal governed by 38 M.R.S. § 471 through 478, and
function of time. Impulse sounds are permitted only if the landfill does not reduce
defined as sound events characterized by the amount of linear berthing areas or space, or
brief excursions of sound pressure, each berthing capacity. If approved, construction
with a duration of less than one second.