Skip to main content

77 Ill. Adm. Code Part 860

Citation
77 Ill. Adm. Code Part 860
Jurisdiction
Illinois (state)
Source
Official source

Full Text

1,781 chars
3) The construction and installation of the sewer mains and lift stations must
meet the requirements of the Illinois Environmental Protection Agency
(35 Ill. Adm. Code 370, Illinois Recommended Standards for Sewage
Works) for construction after July 1, 1998. Manholes shall be provided at
every change in direction or grade of every main sewer line, at the upper
end of every main sewer line, at every junction of two or more branch
sewers, and at intervals of not more than 400 feet. Cleanouts extending to
grade level may be used instead of manholes on sewer lines less than 8
inches in diameter, and shall be at intervals of not more than 100 feet.
(Type A Violation)

c) Malfunctioning sewage disposal systems shall be repaired and maintained in
compliance with the requirements specified in subsection (a) of this Section.
Within 48 hours after notification from a resident or a Department representative,
untreated sewage on the ground as a result of a malfunction shall be removed to
the extent possible and the contaminated ground surface shall be covered with
lime or similar material. (Type C Violation)
DPH 77 ILLINOIS ADMINISTRATIVE CODE 860 860.240

(Source: Amended at 43 Ill. Reg. 2558, effective February 6, 2019)

Section 860.250 Electrical

a) New Installations

1) All electrical distribution systems constructed or replaced after July 1,
1998 and before July 1, 2005 shall be designed and constructed to
conform to the requirements of the National Electrical Code, 1996 Edition.
Article 550-C of the National Electrical Code contains specific
requirements for manufactured home communities. Design, construction,
and replacement of electrical distribution systems shall be in accordance
with the 2014 edition of the National Electrical Code. (Type C Violation)