Skip to main content

77 Ill. Adm. Code Part 860

Citation
77 Ill. Adm. Code Part 860
Jurisdiction
Illinois (state)
Source
Official source

Full Text

1,778 chars
E) An approved shut-off valve shall be provided near the street or site
line for installations after July 1, 1998. (Type A Violation)

d) The manufactured home community owner shall be responsible for sampling of
the water supply system and submitting the results as required by the Department.
Routine water sampling will not be required by the Department for water supplies
regulated by the Illinois Environmental Protection Agency. (Type A Violation)

e) If the water distribution system is not regulated by the Illinois Environmental
Protection Agency, the following requirements shall be met. When a break
occurs in the manufactured home community's distribution system or the pressure
in the water distribution system is below the minimum 20 pounds per square inch,
the Department's regional office (see Section 860.Appendix A) shall be notified
by telephone within 24 hours or the next business day. The affected residents
shall be notified immediately by the manufactured home community management
of the need to boil their water for three minutes before drinking it. A sign shall be
posted at the entrance(s) of the manufactured home community. The Department
shall advise the manufactured home community when the boil order can be lifted.

f) All water leaks in the water distribution system, including those under the
manufactured home, shall be repaired within 72 hours after notification from a
resident or a Department representative. (Type A Violation)

g) Notification of planned water supply interruptions for periods greater than one
hour shall be provided by the manufactured home community management to the
residents affected by the interruption. (Type A Violation)

(Source: Amended at 43 Ill. Reg. 2558, effective February 6, 2019)

Section 860.240 Sewage