Skip to main content

77 Ill. Adm. Code Part 860

Citation
77 Ill. Adm. Code Part 860
Jurisdiction
Illinois (state)
Source
Official source

Full Text

1,702 chars
(Source: Amended at 43 Ill. Reg. 2558, effective February 6, 2019)

Section 860.130 Flood Plain Requirements

Prior to the issuance of a construction permit, the permit applicant shall submit with the
application a completed "Special Flood Hazard Area Request Form" provided by the
Department. If the site is within a Special Flood Hazard Area, the applicant shall forward the
plans for the project to the Illinois Department of Natural Resources, Office of Water Resources.
No project to be located in a Special Flood Hazard Area shall be issued a permit without a copy
of a statement from the Office of Water Resources that the construction complies with the
requirements of Executive Order 79-4, effective May 31, 1979. Construction of items such as
water wells, septic tanks, underground utilities, light poles, pavilions, playground equipment,
sidewalks and driveways as specified in Statewide Permit Number 6, issued by the Office of
Water Resources, are exempt from the requirements of this Section.

(Source: Amended at 43 Ill. Reg. 2558, effective February 6, 2019)

Section 860.140 Occupancy of New Sites

No manufactured home shall be placed on a site that has not been licensed by the Department.
Upon the completion of the construction of new sites, the Department's regional office shall be
contacted (see Section 860.Appendix A) to arrange for an inspection. After approval is granted
by the inspector, the fee for the license for the new site(s) shall be submitted before the new
site(s) shall be licensed or occupied. (Type A Violation)
DPH 77 ILLINOIS ADMINISTRATIVE CODE 860 860.140

(Source: Amended at 43 Ill. Reg. 2558, effective February 6, 2019)

Section 860.150 Immobilization