Abril-Rivera v. Johnson, 806 F.3d 599 (2015)

Citation
Abril-Rivera v. Johnson, 806 F.3d 599 (2015)
Parent Document
Abril-Rivera v. Johnson, 806 F.3d 599 (2015)
Effective Date
2015-11-17

Other Sections in This Document (839)

Full Text

684 chars
However, the lease on the facility would expire at the end of September 2008, unless temporarily extended. As it was, FEMA occupied the facility until February 2009. A new facility would have cost FEMA nearly $9 million up front and would have had an annual operating cost of approximately $19 million. The report concluded that, because the remainder of the NPSC system had the capacity to absorb the PR-NPSC’s workload, these potential expenses were not justified, and it was preferable to simply let the facility’s lease expire and not build a new facility. The report also included a list of options for addressing the PR-NPSC’s deficiencies that had been considered and rejected.