Torre Specialties, Inc. v. Coates, 832 S.W.2d 914 (1992)

Citation
Torre Specialties, Inc. v. Coates, 832 S.W.2d 914 (1992)
Parent Document
Torre Specialties, Inc. v. Coates, 832 S.W.2d 914 (1992)
Jurisdiction
Missouri (state)
Effective Date
1992-05-26

Other Sections in This Document (29)

Full Text

758 chars
Several months elapsed without performance of the build-out. Dr. Coates orally agreed with Shelia Soptic, a corporate officer of Forty-One Twelve Associates, that Dr. Coates would directly hire and pay a contractor to complete the premises occupied by Dr. Coates, for which Forty-One Twelve Associates would reimburse Dr. Coates $15,000.00 plus interest, as well as $185.00 for painting the outside of the dividing wall between the elevator lobby and her office wall. The build-out began during the summer of 1987, continuing through December of that same year. Dr. Coates, after experiencing problems with the heating, ventilation, and air conditioning systems, contacted Forty-One Twelve Associates. The landlord repaired the problem on numerous occasions.