INTERNAL PROTOTYPE — NOT LEGAL ADVICE — DO NOT SEND

Sec. 6-167

Citation
Sec. 6-167
Parent Document
Portland City Code ch. 6
Jurisdiction
Portland (municipal)

Other Sections in This Document (920)

Full Text

1,015 chars
A copy of the final submission of LEED documentation to the
USGBC or final LEED certification decision, or a statement of final
certification from a licensed engineer or qualified professional
indicating that the project meets the standards along with any
amendment to the preliminary energy model shall be submitted to the
city’s department of planning and urban development prior to the
issuance of a certificate of occupancy for new construction or
renovation projects that are required to meet the standards set
forth in section 6-167. A temporary certificate of occupancy may
be issued by the city if necessary prior to the submission of final
LEED documentation to the USGBC. Equivalent documentation from a
licensed engineer or qualified professional is required if compliance is
met with other third-party certification and quality assurance systems.
(Ord. No. 187-08/09, 4-6-09; Ord. No. 103-11/12, 2-6-12; Ord. No. 82-13/14,
11-4-13; By Referendum, 11-3-2020) Sec. 6-170. Partial exemption and exceptions.