¶61 In Berschauer/Phillips, 124 Wn.2d 816, we again decided a question of duty. We held as a matter of public policy that design professionals are not liable in tort to a general contractor for design defects that result in construction delays. Id. at 826. Although we relied upon the logic of our previous independent duty holdings that as a *415matter of public policy, in the construction industry parties could allocate risk among themselves in their contracts. Berschauer/Phillips differed from other cases in which we have discussed the independent duty doctrine because most of the parties had no contracts between or among themselves; thus, we were not saying the parties were limited to their contract remedies. We simply held, based upon public policy considerations, there was no duty of care owed by design professionals to general contractors. Id. at 826-28.