Heath v. Palmer, 2006 VT 125 (2006)
- Citation
- Heath v. Palmer, 2006 VT 125 (2006)
- Parent Document
- Heath v. Palmer, 2006 VT 125 (2006)
- Jurisdiction
- Vermont (state)
- Effective Date
- 2006-11-20
- Original Source
- https://www.courtlistener.com/opinion/2092056/heath-v-palmer/ ↗
Other Sections in This Document (26)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
- Heath v. Palmer, 2006 VT 125 (2006)
Full Text
542 chars¶ 3. Plaintiffs submitted a thirty-day inspection report on a form provided by defendants detailing a number of alleged construction defects throughout the house. Plaintiffs created and submitted their own checklist for the ninety-day and twelve-month inspections setting forth an extensive list of additional defects. Plaintiffs sent an additional defects list in June 2002, followed by a detailed structural engineering report listing the alleged defects room-by-room with cost estimates for each item of repair. The total exceeded $30,000.