24 C.F.R. § 92.251

Citation
24 C.F.R. § 92.251
Source
Official source

Full Text

1,797 chars
section and to verify the information submitted by owners in accordance with the requirements of § 92.252. The participating jurisdiction must perform inspections in accordance with its established inspection procedures. These procedures, at minimum, must include the following requirements:
(i) Frequency of inspections. The participating jurisdiction must perform an on-site inspection within 12 months after project completion and complete one of the following every 3 years during the period of affordability:
(A) Perform an on-site inspection in accordance with the participating jurisdiction's inspection procedures to determine compliance with the property standards; or
(B) Accept a determination made within the past 12 months in satisfaction of another funding source's requirements, that the HOME-assisted project and units are decent, safe, sanitary, and in good repair in an inspection conducted under the National Standards for the Condition of HUD housing (24 CFR part 5, subpart G) or an alternative inspection standard, which HUD may establish through Federal Register publication. If a participating jurisdiction is accepting a determination, then the participating jurisdiction must document the determination in accordance with § 92.508(a)(3)(iv) and is not required to perform an on-site HOME inspection of the project and the units for compliance with 24 CFR 5.703.
(ii) Annual certification. The owner must annually certify to the participating jurisdiction that each building and all HOME-assisted units in the project are suitable for occupancy, taking into account State and local health, safety, and other applicable codes, ordinances, and requirements, and the ongoing property standards established by the participating jurisdiction.
(iii) Units inspected. Inspections