92.508(a)(3)(iv) and is not required to perform a HOME inspection of the project and units for compliance with 24 CFR 5.703.
(ix) Capital Needs Assessments. For multifamily rental housing projects of 26 or more total units, the participating jurisdiction must determine all work that will be performed in the rehabilitation of the housing and the long-term physical needs of the project through a capital needs assessment of the project.
(x) Broadband infrastructure. For new commitments made after January 19, 2017 for a substantial rehabilitation project of a building with more than 4 rental units, any substantial rehabilitation, as defined in 24 CFR 5.100, must provide for installation of broadband infrastructure, as this term is also defined in 24 CFR 5.100, except where the participating jurisdiction determines and, in accordance with § 92.508(a)(3)(iv), documents the determination that:
(A) The location of the substantial rehabilitation makes installation of broadband infrastructure infeasible;
(B) The cost of installing broadband infrastructure would result in a fundamental alteration in the nature of its program or activity or in an undue financial burden; or
(C) The structure of the housing to be substantially rehabilitated makes installation of broadband infrastructure infeasible.
(xi) Carbon monoxide and smoke detection —(A) Carbon monoxide detection. A carbon monoxide alarm must be installed in the housing unit in a manner that meets or exceeds the carbon monoxide detection standards set by HUD through Federal Register publication.
(B) Smoke detection. ( 1 ) A hardwired smoke alarm must be installed:
( i ) On each level of each housing unit;
( ii ) In or near each sleeping area in each housing unit;
( iii ) In the basement of each housing unit, and in each common