Driscoll v. Toll MA Ltd. Partnership, 26 Mass. L. Rptr. 345 (2009)

Citation
Driscoll v. Toll MA Ltd. Partnership, 26 Mass. L. Rptr. 345 (2009)
Parent Document
Driscoll v. Toll MA Ltd. Partnership, 26 Mass. L. Rptr. 345 (2009)
Jurisdiction
Massachusetts (state)
Effective Date
2009-12-28

Other Sections in This Document (35)

Full Text

593 chars
In April 2007, while litigation was pending, Donald Driscoll intentionally shut off the sump pump overnight during a heavy rainstorm to record video of water infiltration in the basement for purposes of litigation. In August 2008, the defendants offered to hardwire the sump pump and to install a battery backup to protect against power outages, but the plaintiffs did not allow the defendants to perform the proposed work. In December 2008, the plaintiffs experienced a power outage during a major ice storm, which caused the sump pump to stop working and allowed water to enter the basement.