undertaken in the year in question and their estimated costs, and any other information required for participation in the Capital Fund. PHAs also are required to include 5-Year Plans covering large capital items.
(h) A statement of any demolition and/or disposition —(1) Plan for Demolition/Disposition. With respect to public housing only, a description of any public housing development, or portion of a public housing development, owned by the PHA for which the PHA has applied or will apply for demolition and/or disposition approval under section 18 of the 1937 Act (42 U.S.C. 1437p), and the timetable for demolition and/or disposition. The application and approval process for demolition and/or disposition is a separate process. Approval of the PHA Plan does not constitute approval of these activities.
(2) Interim Plan for Demolition/Disposition. (i) Before submission of the first Annual Plan, a PHA may submit an interim PHA Annual Plan solely for demolition/disposition. The interim plan must provide:
(A) The required description of the action to be taken;
(B) A certification of consistency with the Consolidated Plan;
(C) A description of how the plan is consistent with the Consolidated Plan;
(D) A relocation plan that includes the availability of units in the area and adequate funding; and
(E) Confirmation that a public hearing was held on the proposed action and that the resident advisory board was consulted.
(ii) Interim plans for demolition/disposition are subject to PHA Plan procedural requirements in this part (see §§ 903.13, 903.15, 903.17, 903.19, 903.21, 903.23, 903.25), with the following exception. If a resident advisory board has not yet been formed, the PHA may seek a waiver of the requirement to consult with the resident advisory board on the grounds that